Our roof has been installed. The builder sent us this video of the spray foam that goes down first. We believe the elastomeric roof coating has been put down on top of this foam already.
Month: December 2022
Electrical installation continues
We aren’t anywhere near the house right now (we are back in the Northeast for the holidays), but thanks to the builder and a considerate neighbor, we have a good idea of what is going on.
When we left, this was the wall where the solar components are going. Kind of messy.

As of today, this is what it looks like.

The trench has been dug to get the power from the road to the house.

While the guy doing the dirt work was there, he leveled out the ground next to the RV garage.

The guy doing the stucco showed up.

So more progress! We shall have to see what gets done between now and Christmas.