Things are really moving. We constantly have multiple vehicles parked in our front yard. The trades are working in parallel in order to keep things moving. For example, the tile guys did the tile floor grout in the kitchen first so the cabinet installer could come in and work.
Let’s start with a video I shot last Sunday.
Since then the tile floor is almost all in. They installers are down to the fussy parts now, all the little cuts they have to make. And it turns out the installers were short of tile, about 12 boxes short. So yesterday the hubby and I offered to drive down to El Paso and pick it up. That was our good deed for the day! It keeps the progress going.
The gray coat of stucco was finished up yesterday morning. Yay!!!! We aren’t sure when the elastomeric spray goes on. When it does, the RV is outta here! No over-spray for us.

This morning the cabinet installer showed up.

The tile is also going in the shower and around the tub. I don’t have a picture of that yet, I don’t want to get in the installer’s way. But this is what the tile looks like.

I’ll leave you with a picture of this morning’s sunrise. The day started out beautifully…let’s hope things continue that way!

Looking good!!!! I think that I could get lost in your house!!!! Do you have a new job in your future —- house designer?
The house isn’t THAT big. Ok, the RV garage might be. And no, no job as a designer in my future. Ugh. 🙂