Our “stuff” has arrived!

Since our last blog post, it’s been an exhausting whirlwind of activity. A week ago, we flew back to the Northeast to gather up all our belongings and get them to the Southwest.

We had 80% of our “stuff” already packed up. But it took two days to finish the last 20%. We hired a crew of movers to get the stuff out of the basement of our former residence and into the truck. Our legs/knees just can’t do it anymore.

Huge thanks to Dave/Marsha and Mary Ellen for pitching in and helping. They will always have an open invitation to visit us inour new city.

We drove back to our new hometown in three days. That is 2000 miles in three days. Yes, we are exhausted.

On this end, we reversed the process. We hired movers to unload the truck and put the stuff in the RV garage. The house still isn’t ready for us, but it’s getting close.

Let the off loading begin!
This pile seems so much bigger up close! We are amazed it all fit in a 26′ truck.

While we were unloading, the stucco crew was on site. In fact, they were able to get the final stucco coat on the front of the RV early this morning so the scaffolding could come down. That made it so much easier to back the moving truck up to the garage opening.

It’s no easy feat to stucco a tall RV garage!
The back of the house has it’s final coat of stucco on it.

There are some definite changes inside the house. We have counter tops, plumbing (including working toilets!), and light fixtures.

I absolutely LOVE the granite counter tops! And check out the linear pendant light over the island. Love it!!!

Here’s the pendant light from another angle.

Our entry way has a contemporary chandelier. But we still don’t have the correct front door.
We have the ceiling fan in the living room now. The cedar beams will be stained this week.
We have lights in the master bathroom.
And finally, the laundry sink has been installed.

The painters/tilers will be here on Monday to finish up their punch list. I’m hoping the stucco installers will be done in a few days. We have a broken window that needs to be replaced. But we are getting close.

The one thing that may hold us up is the connection to the natural gas at the street. The gas company has been called, but someone is dragging their feet. So for now, the RV is still home.

Flying along….

Want to see what our neighborhood and surrounding area look like? Seriously! Our friends who were here last week have a drone. Dan willingly got it out to shoot a video of our neighborhood and house. Check it out. The video is 2.5 minutes long. Thanks Dan!

Things are flying along in other respects too.

The floors are in and so are the cabinets.
Shelves are installed in the pantry. The opening below the counter is for a beverage fridge.

The master bath cabinets are in.
The tile work is done in the guest bathroom. The proportions of this picture are a tad off. The bathtub is a standard size tub.

The master bath snail shower is done. A snail shower means you don’t need a door or shower curtain since the shower curls into itself.

We have a seat opposite the shower head.

There are three nichos in the wall to hold shampoo, etc.

We are now in the midst of picking out backsplash tile and towel bars.

Here we are auditioning backsplash tile to go with our granite. I think the granite on the left wins. But no promises. We are taking yet another trip to the store this afternoon.

One of the builder’s assistants just showed up at the house. I think we just got a tankless water heater and a light fixture delivered!